Vegetables
Menu

What's in the Pack?

Contents
24 SHIVA Grow Essenza Verde + 12 SHIVA Amino+ sachets · 1 sachet = 5 litres of irrigation water (10 litres for seedlings).
Easy to use
Grow Essenza Verde and Amino+ can go in the same watering can – no separate watering round, no complicated alternating.
Quality
100% water-soluble, micronised powder · manufactured in line with EU Regulation 2019/1009.
SHIVA Essenza Verde Pack

SHIVA Grow Essenza Verde

NPK12 – 6 – 30
Iron formEDTA-chelated iron
Magnesiumchlorophyll, leaf colour
Pack24 sachets in the Pack
Seedlings1 sachet / 10 L · weekly
Mature plants1 sachet / 5 L · 1–2× a week (depending on the phase)
Greenhouse / polytunnelfull strength, same as outdoors
High K (30%) = more and tastier fruit, higher sugar content. N (12%) = shoot growth, chlorophyll.
SHIVA Amino+

SHIVA Amino+

CompositionN 11.5% – organic nitrogen of plant origin (protein hydrolysate)
Pack12 sachets in the Pack
Dosage1 sachet / 5 L · every two weeks (as per the phase programme)
CompatibilityCan be mixed with the Grow feed solution
Organic nitrogen of plant origin (protein hydrolysate) to support vegetative growth.
Mixing order – every time you water

Mixing order – every time you water

1.Fill the can with about 1 litre of water – don't pour the powder into a dry can
2.Open the SHIVA Grow Essenza Verde sachet and pour it into the water
3.If it is due according to your programme, the Amino+ sachet goes in too
4.Top up to 5 litres (10 litres for seedlings) and stir
5.Water the same day; store any leftover in a closed container for no more than 2 weeks
The ideal water pH is 6.0–7.0.
Product composition overview
ProductNPK / compositionFunctionPackDosage
SHIVA Grow Essenza VerdeNPK 12-6-30Complete seasonal nutrition – rich in potassium for fruiting24 sachets in the Pack1 sachet / 5 L 1–2× a week · seedlings 1 sachet / 10 L weekly
SHIVA Amino+N 11.5% – organic nitrogen of plant origin (protein hydrolysate)Organic nitrogen source to support vegetative growth12 sachets in the Pack1 sachet / 5 L every two weeks
SHIVA doses per plant – the same as in the advisor
pH and EC target values – Overview
PlantpH targetEC seedling (mS/cm)EC vegetativeEC fruit / harvest
Tomato6.0–6.80.8–1.21.5–2.52.0–3.5
Pepper6.0–6.50.8–1.21.2–2.01.5–2.5
Cucumber6.0–6.80.8–1.21.5–2.51.5–2.5
Leaf lettuce6.0–7.00.4–0.60.8–1.5–
Spinach6.5–7.50.4–0.60.8–1.2–
Courgette6.0–6.80.6–1.01.0–1.81.5–2.5
Aubergine5.8–6.50.8–1.21.5–2.01.5–2.5
Radish6.0–7.00.3–0.50.6–1.0–
Green beans6.0–7.00.4–0.60.8–1.2–

Annual sowing calendar

The same dates as in the Feeding advisor · EU average – may vary with the weather, so check your local conditions!

SSowing / raising seedlings (S)
GGrowth, planting out (G)
FFlowering / ripening (F)
HHarvest (H)
!Avoid – summer heat (!)
–Break (–)
Outdoors (open ground)
PlantJanFebMarAprMayJunJulAugSepOctNovDec
Tomato–SSGGFHHH–––
Pepper–SSGGFHHHH––
Cucumber–––SGFHHH–––
Courgette–––SSFHHH–––
Aubergine–SSGGFFHH–––
Leaf lettuce––SHHH!HHH––
Spinach––SGH!–SGHH–
Rocket––SHHH!HHH––
Pak choi––SGH!–SGH––
Radish––SHHH!SHH––
Green beans––––SGHHH–––
Broccoli–SSGHSGGHH––
Potato––SSGHHHH–––
Onion––SSGGHH––––
GarlicGGGGGHH––SSG
Carrot–––SSGHHHH––
Root parsleyH–SSGGGGGHHH
Cabbage–SSGGHHHHH––
Kohlrabi––SSHHHHHH––
Pea––SSHHH–––––
Sweetcorn–––SSGHHH–––
Winter squash (pumpkin)–––SSGGFHH––
Watermelon–––SSGGHH–––
Melon–––SSGGHH–––
Beetroot–––SSHHHHH––
Celeriac–SSGGGGGGHH–
HorseradishH–SSGGGGGHHH
Greenhouse / polytunnel
PlantJanFebMarAprMayJunJulAugSepOctNovDec
Tomato–SGGFHHHHH––
Pepper–SSGFHHHHH––
Cucumber––SGFHHHH–––
Courgette––SGFHHHH–––
Aubergine–SSGFFHHH–––
Leaf lettuce–SHHH!!SHHH–
Spinach–SHHH––SHHH–
Rocket–SHHH!!HHHH–
Pak choi–SGHH––SHHH–
Radish–SHHH!!SHHH–
Green beans–––SGHHHH–––
Broccoli–SGGH–SGHHH–
Potato–SGGHH––––––
OnionGGGHH––––SSG
GarlicGGGGHH–––SGG
CarrotGSGGHH––––SG
Kohlrabi–SGHH––SGHH–
Pea–SSGHH––––––
Watermelon––SSGGHH––––
Melon––SSGGHHH–––
Beetroot–SGGHH––––––
Short-cycle leafy vegetables (lettuce, rocket, radish, pak choi, spinach) can be resown every 2–3 weeks during the harvest months too. Enter the sowing date in the Feeding advisor – the app calculates the phases and doses from it. Among the new vegetables we have no reliable data on polytunnel timing for root parsley, cabbage, sweetcorn, winter squash, celeriac and horseradish, so they are not listed in the greenhouse / polytunnel table.

Plant feeding plan

The same programme as in the Feeding advisor · week by week, counted from sowing day

Feeding week by week – from sowing / the start of raising seedlings
Plant / week1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.
Tomato1×1×1×1×1×1×2×2×2×2×2×2×2×2×2×2×2×
Pepper1×1×1×1×1×1×1×1×2×2×2×2×2×2×2×2×2×2×2×
Cucumber1×1×1×2×2×2×2×2×2×2×2×2×
Courgette1×1×1×1×1×1×2×2×2×2×2×2×
Aubergine1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×
Broccoli1×1×1×1×2×2×2×2×2×2×2×2×2×2×
Green beans1×1×1×1×1×1×1×1×1×
Leaf lettuce1×1×1×1×
Spinach1×1×1×1×1×1×
Rocket½½½½
Pak choi1×1×1×1×1×1×
Radish1×1×1×1×
Potato1×1×1×1×1×1×1×1×1×1×1×1×
Onion1×1×1×1×1×1×1×1×1×1×1×
Carrot1×1×1×1×1×1×1×1×1×1×1×1×
Root parsley1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×
Cabbage1×1×1×1×1×2×2×2×2×2×2×2×2×2×2×2×
Kohlrabi1×1×1×1×2×2×2×2×2×2×
Pea1×1×1×1×1×1×1×1×1×1×
Sweetcorn1×1×1×1×1×1×1×1×1×1×1×
Winter squash (pumpkin)1×1×1×1×1×1×1×2×2×2×2×2×2×2×2×
Watermelon1×1×1×1×1×1×2×2×2×2×2×2×2×2×
Melon1×1×1×1×1×1×2×2×2×2×2×2×2×
Beetroot1×1×1×1×1×1×1×1×1×
Celeriac1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×1×
  • SHIVA Grow Essenza Verde half strength: 1 sachet / 10 L
  • full strength: 1 sachet / 5 L
  • 1× 2× ½1× / 2× = feed watering per week, ½ = every two weeks
  • + SHIVA Amino+ this week (1 sachet / 5 L, every two weeks)
Between feeding days, water with plain water. If you add the plant in the advisor with its sowing date, the app tells you every day what to do and how much water to give.
3-zone growing system – continuous harvest all season
ZonePlantCycleSowing / plantingSachets / plant / cycle1 Pack is enough for approx.
A Fast – continuousLeaf lettuce21–30 daysSuccessive sowing every 2–3 weeks, Mar–Sep (semi-shade in summer heat)0.09 Grow100+ plants
Spinach28–42 daysSpring Mar–Apr, autumn Aug–Sep (likes it cool)0.05 Grow100+ plants
Rocket21–28 daysSuccessive sowing every 2–3 weeks, Mar–Sep0.02 Grow100+ plants
Pak choi28–40 daysSpring Mar–Apr, autumn Aug–Sep0.07 Grow100+ plants
Radish18–28 daysSow every 2–3 weeks Mar–May and Aug–Sep (pause in summer heat)0.03 Grow100+ plants
B Medium – main seasonCucumber55–70 days from seedling (approx. 12 weeks from sowing)Raise seedlings in April (3–4 weeks) · plant out late April / May1.27 Grow + 0.39 Amino+18 plants
Courgette45–60 days from seedling (approx. 12 weeks from sowing)Raise seedlings in April (3–4 weeks) or sow direct from mid-May1.28 Grow + 0.24 Amino+18 plants
Broccoli60–90 days from seedling (approx. 14 weeks from sowing)Raise seedlings Feb–Mar (spring) or May–Jun (autumn) · plant out at 4–6 weeks1.76 Grow + 0.4 Amino+13 plants
Green beans50–65 daysSow direct from mid-May to July, a new row every 3–4 weeks0.14 Grow + 0.15 Amino+70 plants
CarrotApprox. 14 weeks from sowingSow direct Apr–early Jul, every 3–4 weeks (early varieties under cover from Mar)0.1 Grow100+ plants
KohlrabiApprox. 10 weeks from sowingSow Mar–Aug every 3–4 weeks (indoors 4–6 weeks before the last frost) · plant out from late Apr0.56 Grow + 0.16 Amino+40 plants
PeaApprox. 11 weeks from sowingSow direct Mar–Jun (best Mar–Apr)0.15 Grow + 0.15 Amino+70 plants
SweetcornApprox. 13 weeks from sowingSow direct in May (1–2 weeks after the last frost) or raise plants in late Apr · plant in a block0.76 Grow + 0.32 Amino+30 plants
BeetrootApprox. 10 weeks from sowingSow direct Apr–Jul, every 3–4 weeks0.07 Grow100+ plants
C Long – main cropTomato90–120 days from seedling (approx. 17 weeks from sowing)Raise seedlings Feb–Mar · plant out: polytunnel Mar–Apr, open ground after 15 May1.63 Grow + 0.52 Amino+14 plants
Pepper100–130 days (approx. 19 weeks from sowing)Raise seedlings Feb–Mar (8–10 weeks) · plant out after late April, frost-free1.56 Grow + 0.54 Amino+15 plants
Aubergine100–130 days (approx. 19 weeks from sowing)Raise seedlings Feb–Mar (8–10 weeks, 25–28 °C) · plant out after mid-May0.94 Grow + 0.33 Amino+25 plants
PotatoApprox. 15 weeks from planting (early varieties shorter)Plant: early varieties late Mar–early Apr, maincrop Apr (chitted seed potatoes)0.84 Grow + 0.4 Amino+28 plants
OnionApprox. 15 weeks from planting setsSets late Mar–Apr · seed Mar–Apr · autumn varieties Sep–Oct0.14 Grow + 0.06 Amino+100+ plants
Root parsleyApprox. 26 weeks from sowing (harvest from October)Sow direct Mar–Apr (soak the seed)0.16 Grow100+ plants
CabbageApprox. 16 weeks from sowing (early varieties); late varieties 20–23 weeksRaise seedlings Feb–Mar (early) or Apr–May (late) · plant out Apr or June1.96 Grow + 0.48 Amino+12 plants
Winter squash (pumpkin)Approx. 18 weeks from sowingRaise plants in late Apr or sow direct from mid-May · plant out late May1.68 Grow + 0.32 Amino+14 plants
WatermelonApprox. 16 weeks from sowingRaise indoors late Apr–mid-May · plant out early June (once nights stay above 12–15 °C)1.6 Grow + 0.32 Amino+15 plants
MelonApprox. 15 weeks from sowingRaise indoors late Apr–mid-May · plant out early June (once nights stay above 12–15 °C)1.44 Grow + 0.32 Amino+16 plants
CeleriacApprox. 32 weeks from sowing (approx. 20 weeks from planting out)Raise seedlings Feb–Mar (needs light to germinate, do not cover) · plant out mid-May1.15 Grow + 0.45 Amino+20 plants
One SHIVA Essenza Verde Pack = 24 sachets Grow + 12 sachets Amino+. The "1 Pack is enough" column shows how many plants it covers for a full cycle if you only grow that plant – for a mixed garden the advisor's "Seasonal sachet need" summary calculates it exactly.
Seasonal schedule (February – November)
MonthYou sow / plantYou tendYou harvestSHIVA feed (as per the advisor)
FebruaryStart tomatoes, peppers, aubergines and spring broccoli in a warm place (22–26 °C) · raise celeriac and early cabbageBright, warm spot, even moisture–Seedlings: Grow 1 sachet / 10 L weekly
MarchLettuce, spinach, rocket, pak choi, radish (in a polytunnel or outdoors), resow every 2–3 weeks · sow peas, root parsley and kohlrabi direct · plant potatoes and onion sets at the end of the month · horseradish root cuttingsPrick out and harden off seedlingsThe first radishes at the end of the monthTomato and pepper seedlings: + Amino+ 1 sachet / 5 L every two weeks · broccoli vegetative: Grow 1 sachet / 5 L 2× a week + Amino+ · lettuce, radish: Grow 1 sachet / 5 L weekly · spinach, pak choi: 1 sachet / 10 L weekly · rocket: 1 sachet / 10 L every two weeks · new vegetables (root crops, peas, onions, potatoes): on the advisor's schedule
AprilStart cucumbers and courgettes · tomatoes into the polytunnel · plant out broccoli · resow leafy vegetables · sow carrots and beetroot · raise sweetcorn, winter squash and melons at the end of the month · plant out cabbageStaking, tying, hardening off before planting outLettuce, radish, rocket, spinachTomatoes vegetative: Grow 1 sachet / 5 L 2× a week + Amino+ every two weeks · peppers, aubergines still seedlings: 1 sachet / 10 L weekly
MayAfter 15 May outdoors: tomatoes, peppers, aubergines, cucumbers, courgettes · sow green beans in place · plant out celeriac (from mid-month) · sow or plant out sweetcorn and winter squashWater in well after planting, remove side shootsLettuce, radish, pak choi · broccoli head at the end of the month · first kohlrabi and peasPeppers, cucumbers vegetative: Grow 1 sachet / 5 L 2× a week + Amino+ every two weeks · aubergines: Grow 1 sachet / 5 L weekly + Amino+ · courgette seedlings: 1 sachet / 10 L weekly
JuneAnother row of green beans · start autumn broccoli · plant out melons · late cabbageFlowering, pollination, water daily in the heatThe first tomatoes, cucumbers, courgettes · early potatoes, garlic, peas, beetroot, early cabbageFruiting crops: Grow 1 sachet / 5 L 2× a week + Amino+ every two weeks · green beans: Grow 1 sachet / 10 L weekly + Amino+ every two weeks
JulyLast row of green beans · plant out autumn broccoli · leafy vegetables only in half shadeMulching, watering in the morningContinuous harvest: tomatoes, peppers, cucumbers, courgettes, green beans · onions, carrots, sweetcorn, garlicCarry on the same way · 5 days before harvest only plain water (tomatoes, lettuce, broccoli)
August – SeptemberAutumn lettuce, spinach, pak choi, radish, rocketFinishing the summer cropsPeppers, aubergines, green beans · autumn broccoli · melons, maincrop potatoes, winter squash (Sep), cabbage, beetroot, carrotsNew sowings follow the March rhythm · finished crops end their programme: plain water only
October – NovemberWinter lettuce under cover · plant garlicClose the polytunnel, ventilateAutumn lettuce, spinach, radish, pak choi, broccoli · celeriac, root parsley, horseradish, winter squash (before frost)Full strength under cover too (1 sachet / 5 L, or the plant's dose) · water less often in cool weather
Balcony / terrace rotation – 4 containers + 2 trays
PlaceSpring (Mar–May)Summer (Jun–Aug)Autumn (Sep–Nov)
Container 1 (20 L+)Cherry tomato (1 plant)Tomato – continuous harvestLeaf lettuce (after the tomato)
Container 2 (20 L+)Pepper (1 plant)Pepper – continuous harvestPak choi / spinach
Container 3 (10 L)Cucumber OR courgette (1 plant)Harvest, then green beansRadish / rocket / kohlrabi
Container 4 (10 L)Leaf lettuce mix (continuously) · peas with supportRocket + radish (in half shade)Winter lettuce, spinach
Tray 1 (shallow)Radish (resow every 3 weeks)Break in the heat, or move to shadeRadish – autumn season
Tray 2 (shallow)Rocket (continuously)Basil / dillSprouts (indoors)
On the balcony and in containers, feed with the same doses as above. Soil in pots dries out faster, so in summer you need to give plain water more often.
Open the Feeding advisor →Enter your sowing date and the app guides you week by week

Tomato

The most popular home-garden vegetable · needs plenty of potassium · likes even watering · plant out after 15 May

Tomato

Basic data medium

Cycle90–120 days from seedling (approx. 17 weeks from sowing)
Sowing / plantingRaise seedlings Feb–Mar · plant out: polytunnel Mar–Apr, open ground after 15 May
Plant spacing50 × 80–100 cm
Temperature18–27 °C (at night min. 13 °C)
Light12–16 hours / day, strong light
Raising seedlings6–8 weeks, 22–25 °C
Soil pH5.5–7.5 (target 6.5)
EC target (fruiting)2.0–3.5 mS/cm
Watering (plain water)5.1–7.7 L / pcs · about 2× a week· as a seedling 0.9–1.4 L
How to waterEvenly – fluctuation causes cracking
Recommended varietiesMaskotka, Sweet Million, Tumbling Tom
On staked, continuously growing (indeterminate) varieties, pinch out the side shoots regularly. Blossom end rot is caused by calcium deficiency and uneven watering – even watering and good soil prevent it.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.25–0.4 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.6 sachets Grow Essenza Verde + 0.5 sachets Amino+ / pcs
NotePlain water only for the last 5 days before harvest
NPK 12-6-30: the potassium-rich formula improves the firmness, sugar content and aroma of the fruit.
Vegetables

Complete phase schedule

Seedling · Week 1–2SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.9–1.4 L / pcs
Seedling · Week 3–6SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 1.1–1.7 L / pcs
Vegetative · Week 7–10SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 4.4–6.6 L / pcs
Flowering · Week 11–14SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 5.1–7.7 L / pcs
Ripening · Week 15–17SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 3.6–5.3 L / pcs
Add to My plants →Free daily watering tips in the app

Pepper

Loves warmth · long seedling stage · needs plenty of potassium · plant out after 15 May (last frosts)

Pepper

Basic data medium

Cycle100–130 days (approx. 19 weeks from sowing)
Sowing / plantingRaise seedlings Feb–Mar (8–10 weeks) · plant out after late April, frost-free
Plant spacing30–40 × 50–60 cm
Temperature20–28 °C (loves warmth)
Light14–16 hours / day
Raising seedlings8–10 weeks, 24–26 °C
Soil pH5.5–7.0 (target 6.5)
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)2.2–3.2 L / pcs · about 2× a week· as a seedling 0.45–0.6 L
How to waterEvenly, moderately
Recommended varietiesSnack pepper, Mini Bell, Lunchbox Red, Corno di Toro
Pinch off the first 2–3 flower buds – you get a stronger plant and considerably more fruit later on.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.25–0.35 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.6 sachets Grow Essenza Verde + 0.5 sachets Amino+ / pcs
Peppers have an outstanding need for potassium: it improves colour intensity, fruit firmness and, in hot varieties, the heat – the 30% K₂O in Grow covers this.
Vegetables

Complete phase schedule

Seedling · Week 1–3SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.45–0.6 L / pcs
Seedling · Week 4–8SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.7–1 L / pcs
Vegetative · Week 9–12SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.2–3.2 L / pcs
Flowering + fruiting · Week 13–19SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.2–3.2 L / pcs
Add to My plants →Free daily watering tips in the app

Cucumber

Fast cropping · high water demand · the more often you pick, the more it produces

Cucumber

Basic data easy

Cycle55–70 days from seedling (approx. 12 weeks from sowing)
Sowing / plantingRaise seedlings in April (3–4 weeks) · plant out late April / May
Plant spacing60 × 120 cm
Temperature22–28 °C (at night min. 15 °C)
Light10–14 hours / day
Raising seedlings3–4 weeks
Supporttraining (net, stake) recommended
Soil pH5.5–7.5 (target 6.5)
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)5.4–8.2 L / pcs · about 3× a week· as a seedling 1.1–1.7 L
How to waterGenerously, daily – high water demand
Recommended varietiesMarketmore, Spacemaster, Mini Munch (for balconies)
Don't leave ripe cucumbers on the plant – they stop new fruit from forming. Daily picking is ideal.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.25–0.4 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.3 sachets Grow Essenza Verde + 0.4 sachets Amino+ / pcs
With daily watering, the potassium in Grow helps keep the plant's water balance in check.
Vegetables

Complete phase schedule

Seedling · Week 1–2SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 1.1–1.7 L / pcs
Seedling · Week 3–3SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 1.1–1.7 L / pcs
Vegetative · Week 4–6SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.9–4.4 L / pcs
Flowering + harvest · Week 7–12SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 5.4–8.2 L / pcs
Add to My plants →Free daily watering tips in the app

Courgette

Heavy cropping, large plant · continuous picking = continuous fruiting

Courgette

Basic data easy

Cycle45–60 days from seedling (approx. 12 weeks from sowing)
Sowing / plantingRaise seedlings in April (3–4 weeks) or sow direct from mid-May
Plant spacing60 × 120 cm (min.)
Temperature18–28 °C
Raising seedlings3–4 weeks
Soil pH6.0–7.0 (target 6.5)
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)8–12 L / pcs · about 2× a week· as a seedling 1.5–2.2 L
How to waterRegularly, generously
Recommended varietiesRomanesco, Black Beauty, Patio Star (for balconies)
If there are few bees, pollinate by hand: touch the male flower's stamen to the female flower's stigma (the female flower has a tiny fruit at its base).
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.3 sachets Grow Essenza Verde + 0.2 sachets Amino+ / pcs
The potassium in Grow improves the flavour and firmness of the fruit; give Amino+ every two weeks from flowering.
Vegetables

Complete phase schedule

Seedling · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 1.5–2.2 L / pcs
Vegetative · Week 5–6SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 6–9 L / pcs
Flowering + fruiting · Week 7–12SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 8–12 L / pcs
Add to My plants →Free daily watering tips in the app

Aubergine

Very warmth-loving · long seedling stage · safest in a polytunnel or a sheltered, sunny spot

Aubergine

Basic data demanding

Cycle100–130 days (approx. 19 weeks from sowing)
Sowing / plantingRaise seedlings Feb–Mar (8–10 weeks, 25–28 °C) · plant out after mid-May
Plant spacing50 × 70 cm
Temperature22–30 °C (very warmth-loving)
Raising seedlings8–10 weeks, 25–28 °C
Soil pH6.0–7.0 (target 6.5)
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)4–6 L / pcs · about 2× a week· as a seedling 0.8–1.2 L
How to waterEvenly – generously in hot weather
Recommended varietiesBlack Beauty, Hansel (mini), Listada de Gandia
Below 18 °C it does not develop, below 15 °C it drops its flowers – grow it in a polytunnel or a sheltered, south-facing spot.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.25–0.4 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.9 sachets Grow Essenza Verde + 0.3 sachets Amino+ / pcs
The potassium in Grow improves fruit quality.
Vegetables

Complete phase schedule

Seedling · Week 1–9SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.8–1.2 L / pcs
Growth + fruiting · Week 10–19SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 4–6 L / pcs
Add to My plants →Free daily watering tips in the app

Leaf lettuce

Fast cycle · needs little feed · resow every 2–3 weeks for continuous picking

Leaf lettuce

Basic data easy

Cycle21–30 days
Sowing / plantingSuccessive sowing every 2–3 weeks, Mar–Sep (semi-shade in summer heat)
Plant spacingloose-leaf 10 × 30 cm, heading 30 × 60 cm
Temperature12–20 °C (optimum 15–18 °C)
Light8–12 hours / day; half shade in summer heat
Sowing depth0.3–0.5 cm (needs light to germinate)
Soil pH6.0–7.0 (target 6.5)
EC target0.8–1.5 mS/cm
Watering (plain water)0.9–1.3 L / pcs · about 3× a week· as a seedling 0.2–0.3 L
How to waterEvenly, in small amounts
Recommended varietiesLollo Rossa, Oak Leaf, Batavia, Butterhead
In the heat it bolts quickly – in summer sow it in half shade and keep it evenly moist.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.08–0.15 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.1 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
NotePlain water only for the last 5 days before harvest
Lettuce needs little feed – Grow once a week is enough.
Vegetables

Complete phase schedule

Full cycle · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 0.9–1.3 L / pcs
Add to My plants →Free daily watering tips in the app

Spinach

Prefers cool weather · grow in spring and autumn · bolts when days are long

Spinach

Basic data easy

Cycle28–42 days
Sowing / plantingSpring Mar–Apr, autumn Aug–Sep (likes it cool)
Plant spacing10 × 38 cm
Temperature7–18 °C (prefers cool weather)
Light6–10 hours / day, sun to half shade
Sowing depth2 cm
Soil pH6.0–7.5 (target 6.5–6.7)
EC target0.8–1.2 mS/cm
Watering (plain water)0.3–0.4 L / pcs · about 3× a week· as a seedling 0.05–0.1 L
How to waterKeep evenly moist
Recommended varietiesMatador, Bloomsdale, Tyee
In acidic soil it turns yellow and dies. When the days are long it bolts – only grow it in spring and autumn.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.05–0.1 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–6SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.3–0.4 L / pcs
Add to My plants →Free daily watering tips in the app

Rocket

Very fast and undemanding · needs little feed · resow every 2–3 weeks for a continuous harvest

Rocket

Basic data easy

Cycle21–28 days
Sowing / plantingSuccessive sowing every 2–3 weeks, Mar–Sep
Plant spacing10–15 × 20–30 cm
Temperature10–22 °C (tolerates down to –5 °C)
Light6–8 hours / day, sun to half shade
Sowing depth0.5–1 cm
Soil pH6,0–7,0
Watering (plain water)0.2–0.3 L / pcs · about 3× a week· as a seedling 0.05–0.1 L
How to waterEvenly, moderately
Recommended varietiesRoquette, Wild Rocket, Wasabi Rocket
Needs very little feed – overfed it becomes tasteless. In the heat it bolts quickly.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.05–0.1 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · every 2 weeks
SHIVA Amino+: –
Water: 0.2–0.3 L / pcs
Add to My plants →Free daily watering tips in the app

Pak choi

Fast leafy vegetable · spring and autumn crop · almost all year round in a polytunnel

Pak choi

Basic data easy

Cycle28–40 days
Sowing / plantingSpring Mar–Apr, autumn Aug–Sep
Plant spacing20–30 × 40–60 cm
Temperature13–21 °C
Light8–10 hours / day, sun to half shade
Sowing depth1 cm
Soil pH6,0–7,5
Watering (plain water)0.9–1.3 L / pcs · about 3× a week· as a seedling 0.2–0.3 L
How to waterKeep evenly moist
Recommended varietiesShanghai Green (mini), Black Summer, Joi Choi
Mini varieties can be picked after 25 days. In a polytunnel it can be grown almost all year round.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.08–0.15 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.1 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–6SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.9–1.3 L / pcs
Add to My plants →Free daily watering tips in the app

Radish

The fastest vegetable · ready in 3–4 weeks · in spring and autumn

Radish

Basic data easy

Cycle18–28 days
Sowing / plantingSow every 2–3 weeks Mar–May and Aug–Sep (pause in summer heat)
Plant spacing5 × 30 cm
Temperature10–18 °C (optimum 14–16 °C)
Lightsun to half shade
Sowing depth1–1.5 cm
Soil pH6.0–7.0 (target 6.5)
EC target0.6–1.0 mS/cm
Watering (plain water)0.1–0.15 L / pcs · about 3× a week· as a seedling 0.05 L
How to waterEvenly – turns woody and hot if it dries out
Recommended varietiesCherry Belle, French Breakfast, Munich beer radish
Too much nitrogen makes it bolt and the root goes hollow. Don't sow above 25 °C – take a break in midsummer.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.03–0.05 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 0.1–0.15 L / pcs
Add to My plants →Free daily watering tips in the app

Green beans

Sown in place, easy-to-grow legume · can be sown from mid-May to July

Green beans

Basic data easy

Cycle50–65 days
Sowing / plantingSow direct from mid-May to July, a new row every 3–4 weeks
Plant spacing10 × 60 cm
Temperature18–25 °C
Sowing depth3–4 cm (sown in place)
Soil pH6.0–7.5 (target 6.2)
EC target0.8–1.2 mS/cm
Watering (plain water)0.7–1 L / pcs · about 2× a week· as a seedling 0.1–0.15 L
How to waterModerately, evenly during flowering
Recommended varietiesBorlotti, Purple Teepee, Goldmine
A legume: the nodules on its roots fix nitrogen from the air, so it needs less feed – the potassium in Grow improves pod quality.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.1–0.2 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.1 sachets Grow Essenza Verde + 0.2 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–9SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.6–0.9 L / pcs
Add to My plants →Free daily watering tips in the app

Broccoli

Cool-loving brassica · spring and autumn crop · produces side shoots after the main head

Broccoli

Basic data medium

Cycle60–90 days from seedling (approx. 14 weeks from sowing)
Sowing / plantingRaise seedlings Feb–Mar (spring) or May–Jun (autumn) · plant out at 4–6 weeks
Plant spacing45 × 60 cm
Temperature15–20 °C (prefers cool weather)
Lightsunny, min. 6 hours / day
Raising seedlings4–6 weeks
Soil pH6.0–7.0 (target 6.5)
Watering (plain water)3.2–4.8 L / pcs · about 2× a week· as a seedling 0.7–1.1 L
How to waterEvenly and generously – do not let it dry out while heads form
Recommended varietiesCalabrese, Green Magic, Belstar
Harvest while the head is still tight and dark green – once the buds start to yellow it is too late. After cutting the main head, smaller heads grow on the side shoots.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.8 sachets Grow Essenza Verde + 0.4 sachets Amino+ / pcs
NotePlain water only for the last 5 days before harvest
Brassicas need plenty of nitrogen and potassium: alongside Grow, give Amino+ according to the phase plan.
Vegetables

Complete phase schedule

Seedling · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.7–1.1 L / pcs
Vegetative · Week 5–8SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.5–3.7 L / pcs
Head formation · Week 9–14SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 3.2–4.8 L / pcs
Add to My plants →Free daily watering tips in the app

Potato

Early and late varieties · from seed potatoes · earthed up

Potato

Basic data easy

CycleApprox. 15 weeks from planting (early varieties shorter)
Sowing / plantingPlant: early varieties late Mar–early Apr, maincrop Apr (chitted seed potatoes)
Plant spacingEarly: 30 × 60 cm; maincrop: 38 × 75 cm
Temperature15–20 °C; the emerged foliage is frost-sensitive
LightSunny
Sowing depth12–15 cm
Soil pH5.0–6.5 (target 6.0)
EC target0.8–1.2 (early phase) · 1.2–1.8 mS/cm (main growth)
Watering (plain water)4.6–7 L / pcs · about 1× a week· as a seedling 0.7–1.1 L
How to waterEvenly while tubers form (around flowering) – rots in waterlogged soil
Recommended varietiesEarly: Riviera · late: Desirée
Start with an early variety: it is ready sooner and leaves less time for potato blight.
Green tubers, the foliage and the berries are harmful if eaten.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.8 sachets Grow Essenza Verde + 0.4 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Emergence · Week 1–3SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.7–1.1 L / pcs
Tuber formation · Week 4–12SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 4–6 L / pcs
Ripening – plain water only · Week 13–15SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 3–4.5 L / pcs
Add to My plants →Free daily watering tips in the app

Onion

From sets or from seed · stores well · also as spring onions

Onion

Basic data easy

CycleApprox. 15 weeks from planting sets
Sowing / plantingSets late Mar–Apr · seed Mar–Apr · autumn varieties Sep–Oct
Plant spacing5–10 × 25–30 cm
Temperature13–24 °C; cold tolerant
LightSunny
Soil pH6.0–7.0 (target 6.5)
EC target0.8–1.2 (early phase) · 1.2–1.8 mS/cm (main growth)
Watering (plain water)0.4–0.6 L / pcs · about 1× a week· as a seedling 0.1–0.15 L
How to waterIn dry spells – once the foliage falls over, stop
Recommended varietiesSets: Stuttgarter Riesen, Sturon · red: Red Baron
Start with onion sets: more reliable and quicker than sowing seed.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.05–0.1 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.1 sachets Grow Essenza Verde + 0.1 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Early phase · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.1–0.15 L / pcs
Main growth · Week 5–11SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.35–0.5 L / pcs
Bulb ripening – plain water only · Week 12–15SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 0.3–0.45 L / pcs
Add to My plants →Free daily watering tips in the app

Garlic

Planted in autumn · little work · harvested in early summer

Garlic

Basic data easy

CyclePlanted in autumn approx. 8–9 months – feeding Mar–May
Sowing / plantingPlant Oct–Nov (recommended) or Feb–Mar
Plant spacing15 × 30 cm
TemperatureCold tolerant; bulbing needs 1–2 months at 0–10 °C
LightSunny
Soil pH6.5–7.5
EC target0.8–1.2 (early phase) · 1.2–1.8 mS/cm (main growth)
Watering (plain water)0.7–1.1 L / pcs · about 1× a week
How to waterIn dry spring weather – stop in the weeks before harvest
Plant in autumn: with little work it practically grows by itself.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.05–0.1 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.2 sachets Grow Essenza Verde + 0.1 sachets Amino+ / pcs
NoteNo feed from June – no watering needed in the weeks before harvest
Vegetables

Complete phase schedule

Early phase · MarSHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.7–1.1 L / pcs
Main growth · Apr–MaySHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.7–1.1 L / pcs
Add to My plants →Free daily watering tips in the app

Carrot

Sown in place · in deep, loose soil · a short-rooted variety on balconies

Carrot

Basic data medium

CycleApprox. 14 weeks from sowing
Sowing / plantingSow direct Apr–early Jul, every 3–4 weeks (early varieties under cover from Mar)
Plant spacing5 × 30 cm (after thinning)
Temperature16–21 °C; germinates above approx. 7 °C
LightSunny
Soil pH6.0–7.0 (target 6.5)
EC target0.6–1.0 mS/cm
Watering (plain water)0.15–0.25 L / pcs · about 2× a week· as a seedling 0.05 L
How to waterMoist until germination, then drought-tolerant – in long dry spells water thoroughly every two weeks
Recommended varietiesNantes, Chantenay · early: Amsterdam
Slow to come up – up to 2–3 weeks: do not let the seedbed dry out until then.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.03–0.05 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.1 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–12SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 0.1–0.2 L / pcs
Ripening – plain water only · Week 13–14SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 0.15–0.2 L / pcs
Add to My plants →Free daily watering tips in the app

Root parsley

Slow to germinate · in deep soil · can stay in the ground over winter

Root parsley

Basic data medium

CycleApprox. 26 weeks from sowing (harvest from October)
Sowing / plantingSow direct Mar–Apr (soak the seed)
Plant spacing10 × 30 cm
Temperature15–20 °C; the root also tolerates frost
LightSun–partial shade
Soil pH6.0–7.0
EC target0.6–1.0 mS/cm
Watering (plain water)0.3–0.5 L / pcs · about 2× a week· as a seedling 0.05–0.1 L
How to waterMoist until germination, then evenly
Recommended varietiesBerliner Halblange
You can pick the leaves too, but only in moderation so that the root can grow.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.03–0.05 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.2 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–20SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 0.2–0.3 L / pcs
Ripening – plain water only · Week 21–26SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 0.3–0.45 L / pcs
Add to My plants →Free daily watering tips in the app

Cabbage

Early and late varieties · protected with netting · in nutrient-rich soil

Cabbage

Basic data medium

CycleApprox. 16 weeks from sowing (early varieties); late varieties 20–23 weeks
Sowing / plantingRaise seedlings Feb–Mar (early) or Apr–May (late) · plant out Apr or June
Plant spacing30–45 × 60 cm (small heads 30 cm, large heads 45 cm)
Temperature15–20 °C; tolerates light frost
LightSunny
Soil pH6.5–7.5
Watering (plain water)2.7–4 L / pcs · about 2× a week· as a seedling 0.6–0.9 L
How to waterEvenly – critical while heads form; a sudden flood of water splits the head
Recommended varietiesEarly: Copenhagen Market · red: Red Drumhead
Start with an early, small-headed variety: it matures sooner and needs protecting from caterpillars for a shorter time.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 2 sachets Grow Essenza Verde + 0.5 sachets Amino+ / pcs
NotePlain water only for the last 5 days before harvest
Vegetables

Complete phase schedule

Seedling · Week 1–5SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.6–0.9 L / pcs
Vegetative · Week 6–10SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.1–3.2 L / pcs
Head formation · Week 11–16SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.7–4 L / pcs
Add to My plants →Free daily watering tips in the app

Kohlrabi

Fast · ready in 8–10 weeks · in balcony boxes too

Kohlrabi

Basic data easy

CycleApprox. 10 weeks from sowing
Sowing / plantingSow Mar–Aug every 3–4 weeks (indoors 4–6 weeks before the last frost) · plant out from late Apr
Plant spacing15 × 30 cm
Temperature15–20 °C; bolts in prolonged cold below 10 °C
LightSunny
Soil pH6.5–7.5
Watering (plain water)0.5–0.7 L / pcs · about 2× a week· as a seedling 0.1–0.15 L
How to waterEvenly – otherwise it turns woody and splits
Recommended varietiesWhite Vienna, Purple Vienna
Quick and rewarding: ready in 8–10 weeks, and it grows in a window box too.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.15–0.25 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.6 sachets Grow Essenza Verde + 0.2 sachets Amino+ / pcs
NotePlain water only for the last 5 days before harvest
Vegetables

Complete phase schedule

Seedling · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.1–0.15 L / pcs
Vegetative · Week 5–7SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.5–0.7 L / pcs
Bulb formation · Week 8–10SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.5–0.7 L / pcs
Add to My plants →Free daily watering tips in the app

Pea

Early spring sowing · likes cool weather · with support

Pea

Basic data easy

CycleApprox. 11 weeks from sowing
Sowing / plantingSow direct Mar–Jun (best Mar–Apr)
Plant spacing7.5 × 45–60 cm
Temperature13–18 °C; cold tolerant, stops growing in heat
LightSunny
Soil pH6.0–7.5
EC target0.8–1.2 mS/cm
Watering (plain water)0.4–0.6 L / pcs · about 2× a week· as a seedling 0.05–0.1 L
How to waterModerately – important from flowering until the pods fill
Recommended varietiesShelling pea: Kelvedon Wonder · sugar pea: Sugar Snap
Good with children: big seeds, easy to sow, and fresh peas can be eaten straight from the plant.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.1–0.2 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.2 sachets Grow Essenza Verde + 0.2 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–10SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 0.35–0.5 L / pcs
Harvest – plain water only · Week 11SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 0.4–0.6 L / pcs
Add to My plants →Free daily watering tips in the app

Sweetcorn

Planted in blocks · into warm soil · harvested in late summer

Sweetcorn

Basic data medium

CycleApprox. 13 weeks from sowing
Sowing / plantingSow direct in May (1–2 weeks after the last frost) or raise plants in late Apr · plant in a block
Plant spacing35–45 × 35–45 cm, in a block
Temperature20–30 °C (soil min. 10–12 °C)
LightSunny
Soil pH5.5–7.0
EC target0.8–1.2 (early phase) · 1.2–1.8 mS/cm (main growth)
Watering (plain water)2.4–3.7 L / pcs · about 2× a week· as a seedling 0.2–0.35 L
How to waterCritical from tasselling until the cobs fill
Recommended varietiesGolden Bantam, Jubilee
Plant at least 9–16 plants in a block: a few plants in a row set poorly.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.8 sachets Grow Essenza Verde + 0.3 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Early phase · Week 1–3SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.2–0.35 L / pcs
Main growth · Week 4–11SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 2.4–3.7 L / pcs
Ripening – plain water only · Week 12–13SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 2.2–3.3 L / pcs
Add to My plants →Free daily watering tips in the app

Winter squash (pumpkin)

Needs plenty of space · bush and trailing varieties · stores over winter

Winter squash (pumpkin)

Basic data medium

CycleApprox. 18 weeks from sowing
Sowing / plantingRaise plants in late Apr or sow direct from mid-May · plant out late May
Plant spacingBush varieties: 90 cm; trailing varieties: 150 cm
Temperature20–30 °C; frost-sensitive
LightSunny
Soil pH6.0–7.0
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)20–30 L / pcs · about 2× a week· as a seedling 3.5–5.3 L
How to waterGenerously, at the base – keep the leaves dry
Recommended varietiesHokkaido, Butternut
One or two plants crop plenty: make sure you have the space rather than many plants.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.7 sachets Grow Essenza Verde + 0.3 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Seedling · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 3.5–5.3 L / pcs
Vegetative · Week 5–7SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 6.6–9.8 L / pcs
Flowering + fruiting · Week 8–15SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 20–30 L / pcs
Ripening – plain water only · Week 16–18SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 16–24 L / pcs
Add to My plants →Free daily watering tips in the app

Watermelon

Needs a warm summer · in the sunniest spot · more reliable under cover

Watermelon

Basic data demanding

CycleApprox. 16 weeks from sowing
Sowing / plantingRaise indoors late Apr–mid-May · plant out early June (once nights stay above 12–15 °C)
Plant spacing100 × 180 cm
Temperature24–30 °C (at night min. 12–15 °C)
LightSunny, warm
Soil pH6.0–7.0
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)18–27 L / pcs · about 2× a week· as a seedling 2.5–3.8 L
How to waterPlenty until the fruit has grown, less 1–2 weeks before ripening
Recommended varietiesSugar Baby, Crimson Sweet
Only try it in a warm summer and in the sunniest spot; as a beginner choose a small-fruited, early variety.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.6 sachets Grow Essenza Verde + 0.3 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Seedling · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 2.5–3.8 L / pcs
Vegetative · Week 5–6SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 7.4–11 L / pcs
Flowering + fruiting · Week 7–14SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 18–27 L / pcs
Ripening – plain water only · Week 15–16SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 14–20 L / pcs
Add to My plants →Free daily watering tips in the app

Melon

In a polytunnel or against a south-facing wall · can also be trained on a support

Melon

Basic data demanding

CycleApprox. 15 weeks from sowing
Sowing / plantingRaise indoors late Apr–mid-May · plant out early June (once nights stay above 12–15 °C)
Plant spacingTrailing on the ground 90 cm; trained up a support 45 cm
Temperature24–30 °C (at night min. 12–15 °C)
LightSunny, warm
Soil pH6.0–7.0
EC target (fruiting)1.5–2.5 mS/cm
Watering (plain water)12–18 L / pcs · about 2× a week· as a seedling 2.5–3.7 L
How to waterPlenty until the fruit has grown, less while ripening – it gets sweeter
Recommended varietiesCharentais, Hale's Best, Ogen
Its best place is a polytunnel or a warm south wall: outdoors it does not ripen in a cool summer.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.3–0.5 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.4 sachets Grow Essenza Verde + 0.3 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Seedling · Week 1–4SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 2.5–3.7 L / pcs
Vegetative · Week 5–6SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 6.2–9.3 L / pcs
Flowering + fruiting · Week 7–13SHIVA Grow Essenza Verde: 1 sachet / 5 L · 2× a week
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 12–18 L / pcs
Ripening – plain water only · Week 14–15SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 8.5–13 L / pcs
Add to My plants →Free daily watering tips in the app

Beetroot

Fast · can be sown every 3–4 weeks · the leaves are edible too

Beetroot

Basic data easy

CycleApprox. 10 weeks from sowing
Sowing / plantingSow direct Apr–Jul, every 3–4 weeks
Plant spacing10 × 30 cm
Temperature15–21 °C; germinates above approx. 7 °C
LightSun–partial shade
Soil pH6.5–7.5
EC target0.6–1.0 mS/cm
Watering (plain water)0.3–0.5 L / pcs · about 2× a week· as a seedling 0.05–0.1 L
How to waterEvenly – otherwise it turns woody and ringed
Recommended varietiesDetroit, Cylindra (cylindrical)
Easy and quick: you can eat the small plants pulled out when thinning, and the young leaves too.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.03–0.05 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.1 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Full cycle · Week 1–9SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: –
Water: 0.25–0.35 L / pcs
Ripening – plain water only · Week 10SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 0.3–0.45 L / pcs
Add to My plants →Free daily watering tips in the app

Celeriac

Long seedling period · needs plenty of water · harvested in autumn

Celeriac

Basic data demanding

CycleApprox. 32 weeks from sowing (approx. 20 weeks from planting out)
Sowing / plantingRaise seedlings Feb–Mar (needs light to germinate, do not cover) · plant out mid-May
Plant spacing30 × 40–45 cm
Temperature16–21 °C; seedlings bolt below 10 °C
LightSun–partial shade
Soil pH6.0–7.0
EC target0.8–1.2 (early phase) · 1.2–1.8 mS/cm (main growth)
Watering (plain water)1.4–2.2 L / pcs · about 2× a week· as a seedling 0.35–0.5 L
How to waterNeeds a lot of water – drying out makes it woody
Recommended varietiesMonarch, Prinz
Raising seedlings takes a long time: as a beginner, buy young plants instead.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.2–0.3 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 1.2 sachets Grow Essenza Verde + 0.5 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Seedling · Week 1–10SHIVA Grow Essenza Verde: 1 sachet / 10 L · weekly
SHIVA Amino+: –
Water: 0.35–0.5 L / pcs
Main growth · Week 11–28SHIVA Grow Essenza Verde: 1 sachet / 5 L · weekly
SHIVA Amino+: 1 sachet / 5 L · every 2 weeks
Water: 1.4–2.2 L / pcs
Ripening – plain water only · Week 29–32SHIVA Grow Essenza Verde: –
SHIVA Amino+: –
Water: 1.4–2.1 L / pcs
Add to My plants →Free daily watering tips in the app

Horseradish

Perennial · spreads vigorously · harvest from the 2nd year

Horseradish

Basic data easy

CyclePerennial – harvest from the 2nd year; feeding May–Aug
Sowing / plantingPlant root cuttings Mar–Apr
Plant spacing40 × 60 cm
TemperatureCold-tolerant perennial, also withstands frost
LightSun–partial shade
Soil pH6.0–7.5
EC target0.8–1.2 mS/cm
Watering (plain water)4.2–6.4 L / pcs · about 1× a week
How to waterOnly in longer dry spells
Recommended varietiesLocal varieties, from root cuttings
One plant is enough for a family; focus on keeping it from spreading.
SHIVA Essenza Verde Pack

SHIVA Essenza Verde programme

PackSHIVA Essenza Verde Pack
Feed solution / feeding0.2–0.4 L / pcs
MixingGrow Essenza Verde and Amino+ can be mixed in one watering can
Greenhouse / polytunnelfull strength, same as outdoors
Indoors (pot)half strength: 1 sachet / 10 L
Per plant for the whole cycleapprox. 0.3 sachets Grow Essenza Verde + 0 sachets Amino+ / pcs
Vegetables

Complete phase schedule

Active season · May–AugSHIVA Grow Essenza Verde: 1 sachet / 10 L · every 2 weeks
SHIVA Amino+: –
Water: 4.2–6.4 L / pcs
Add to My plants →Free daily watering tips in the app

Recognising and fixing deficiency symptoms

Macro- and micronutrients · what you see, what's missing, what to do

Macronutrients

Plants need micro- and macronutrients in small amounts, but a deficiency can cause serious crop losses. Recognising the visible symptoms is key to stepping in early.

N

Nitrogen

Main component of chlorophyll and proteins. Stimulates vigorous leaf and shoot growth. Decisive in the vegetative phase.

Deficiency symptomThe lower leaves turn yellow first, then it spreads upwards. Slow growth, pale foliage.
Most common in vegetablesLettuce, spinach, pak choi, broccoli
What to doCheck whether the plant is getting SHIVA Grow regularly as per the programme. Quick help: SHIVA Amino+ 1 sachet / 5 L.
P

Phosphorus

Root development, flowering and energy transfer (ATP). Critical during flowering and fruit set.

Deficiency symptomPurplish-red discoloration of the leaves, especially on the undersides. Slow flowering, weak root system.
Most common in vegetablesTomato and pepper seedlings in the cold
What to doPhosphorus cannot be taken up from cold soil: only plant into soil above 12 °C and keep seedlings warm. Measure the pH (6.0–7.0).
K

Potassium

Water and nutrient transport, turgor, disease resistance. Especially important in the final phase.

Deficiency symptomLeaf edges turn brown and dry out. Weak stems, reduced resistance.
Most common in vegetablesTomatoes, peppers, cucumbers, courgettes when fruiting
What to doSHIVA Grow Essenza Verde is rich in potassium (NPK 12-6-30): keep feeding 2× a week while fruiting.
Ca

Calcium

Cell wall building, root growth, nutrient uptake. Not mobile – needs a continuous supply.

Deficiency symptomYoung leaves become deformed, brown spots appear. Blossom end rot in tomatoes and peppers.
Most common in vegetablesTomatoes, peppers (blossom end rot), lettuce (tip burn)
What to doIn vegetables it is almost always a watering mistake: calcium is only carried by water. Water evenly, mulch the soil and remove affected fruit.
Mg

Magnesium

The centre of the chlorophyll molecule. Supports photosynthesis, enzyme activity and phosphorus uptake.

Deficiency symptomInterveinal chlorosis: the veins stay green, the tissue between them yellows. Appears on older leaves.
Most common in vegetablesTomatoes, peppers, cucumbers
What to doDon't concentrate the feed solution: excess potassium blocks magnesium uptake. Measure the pH.
S

Sulphur

Component of amino acids and proteins. Enzyme activator, supports terpene production.

Deficiency symptomEven yellowing of young leaves (starting from the top). Slow growth.
Most common in vegetablesBroccoli and other brassicas
What to doRare. Keep to the doses and frequency of the SHIVA programme.
Micronutrients (trace elements)
Fe

Iron

Chlorophyll synthesis, nitrogen fixation, enzyme component.

Deficiency symptomYoung leaves turn yellow, the veins stay green. Most common cause: alkaline soil (pH>7).
Most common in vegetablesTomatoes, spinach on alkaline soil
What to doMeasure the pH first! On alkaline soil (above pH 7) iron is harder to take up.
Mn

Manganese

Chlorophyll synthesis, vitamin C and nitrogen metabolism. More available on acidic soil.

Deficiency symptomInterveinal chlorosis on young leaves, alkaline soil. Pale appearance, slow development.
Most common in vegetablesGreen beans, spinach, radish
What to doMeasure the pH; don't lime alkaline soil.
Zn

Zinc

Component of enzyme systems, protein synthesis, production of growth hormones.

Deficiency symptomShort internodes, small leaves, yellowing and spotting. Late ripening.
Most common in vegetablesGreen beans, in a cold spring
What to doCommon in cold, wet soil: it sorts itself out when the weather warms up.
Cu

Copper

Reproduction, enzyme activity, chlorophyll synthesis. Supports root development and protein use.

Deficiency symptomYoung leaves turn yellow, then die off. In extreme cases the leaves shrivel.
Most common in vegetablesLettuce, spinach on peaty, sandy soil
What to doRare. Keep to the doses of the SHIVA programme.
B

Boron

Cell membranes, root and shoot growth, sugar transport. Critical during fruit set.

Deficiency symptomMore common on alkaline soil. Dying growing tips, deformed leaves, bud drop.
Most common in vegetablesBroccoli (hollow stem), radish, tomatoes
What to doWater evenly (boron cannot be taken up from dry soil) and measure the pH: common above 7.
Mo

Molybdenum

Nitrogen metabolism, protein synthesis, converting inorganic phosphates into organic form.

Deficiency symptomTypical on acidic soil. Pale, deformed leaves, slow growth.
Most common in vegetablesBroccoli, cauliflower on acidic soil
What to doOn acidic soil (below pH 5.5) raise the pH with garden lime in autumn.
Plants get carbon, hydrogen and oxygen from air and water – these make up most of the plant's biomass. Alongside the 13 nutrients, they are essential too.
From symptom to solution – vegetables
SymptomLikely causeMost common inWhat to do
Even yellowing of the lower leavesNitrogen deficiency (N)Lettuce, spinach, leafy vegetablesMissed a feed? Go back to the programme; quick help: SHIVA Amino+ 1 sachet / 5 L
Purplish-red leaf undersides, stemPhosphorus (P) – usually cold soilTomato and pepper seedlingsWarmer spot; only plant into soil above 12 °C; pH 6.0–7.0
Blossom end rot, leaf edge burnCalcium (Ca) – uneven wateringTomatoes, peppers, courgettes, lettuceEven watering, mulch; remove affected fruit
Yellowing between the veins – young leavesIron (Fe) or manganese (Mn) – alkaline soilTomatoes, spinach, green beansMeasure the pH first! Above pH 7 iron gets locked up
Yellowing between the veins – older leavesMagnesium (Mg)Tomatoes, peppers, cucumbersDon't concentrate the feed solution; measure the pH
Dying shoot tip, hollow stem, deformed leafBoron (B)Broccoli, radish, tomatoesEven watering; pH should not be above 7
Bolts, runs to flowerHeat stress / long daysLettuce, rocket, spinach, radishShade in summer; sow cool-loving crops in spring and autumn
Poor rooting, slow developmentPhosphorus (P) / general stressAny seedlingKeep to the SHIVA programme; pH 6.0–6.5
Quick diagnosis – where does the symptom appear?
Where?What does it mean?What to do
Starts on lower / older leavesMobile element (N, P, K, Mg) – the plant moves it to the young partsCheck whether a feed watering was missed – keep to the SHIVA programme
Appears on young / top leavesImmobile element (Ca, Fe, Mn, B) – cannot move backMeasure the pH first! Above pH 7 iron lock-up; with Ca, even watering
Evenly across the whole plantGeneral nutrient deficiency OR pH problemMeasure the pH, then the SHIVA programme as per the advisor
The iron in SHIVA Grow is EDTA-chelated. With alkaline tap water (above pH 7.2) iron is harder to take up – in that case it is worth checking the pH.
Ask Dr. Gringro

© 2026 GreenGro Plants s.r.o. · All rights reserved.